Citation: Mich Electric Transmission Co, LLC v Mich Pub Power Agency, ___ Mich App ___; ___ NW3d ___; 2025 WL 1738009 (2025) (Docket No. 368921). Decided June 23, 2025.
Summary. The Court of Appeals held that a transmission owner’s right of first refusal requires that its lines physically join the new project.
Background
Two new regionally cost-shared transmission line projects were planned in lower Michigan. Michigan Electric Transmission Company, LLC owns the substations to which the projects will connect. The Michigan Public Power Agency owns 90% of the nearby Oneida Lines and claimed a share of the right to build the projects under the transmission infrastructure planning act, MCL 460.591 et seq. The Ingham Circuit Court granted summary disposition to Michigan Electric Transmission Company.
Holding
The Court of Appeals affirmed. The right of first refusal under MCL 460.593(1)(b) belongs to an incumbent whose facilities the project will interconnect to. Given the Legislature’s use of the phrase “interconnect to facilities owned,” the Oneida Lines must physically join the projects. They did not.
Significance
Only transmission owners whose facilities physically connect to a new project share the statutory right to build it.
Opinions
Judge Rick wrote for a unanimous panel that included Judges Garrett and Feeney.
Citation
Mich Electric Transmission Co, LLC v Mich Pub Power Agency, ___ Mich App ___; ___ NW3d ___; 2025 WL 1738009 (2025) (Docket No. 368921). Decided June 23, 2025. Read the full opinion (PDF) from the Michigan Court of Appeals.
This summary is provided for general information about developments in Michigan law. It does not constitute legal advice. Readers should consult the full opinion because the case may be subject to further proceedings.