In re Application of Enbridge Energy to Replace and Relocate Line 5

Citation:  In re Application of Enbridge Energy to Replace and Relocate Line 5, ___ Mich ___; ___ NW3d ___ (2026) (Docket Nos. 168335-168339, 168346).  Decided July 31, 2026.

Summary.  The Michigan Supreme Court vacated the approval of the Line 5 tunnel project and remanded the matter to the Michigan Public Service Commission (“PSC”).  On remand, the PSC must determine whether the tunnel will extend the operating life of the entire pipeline, must compare alternatives on an equivalent basis, and must evaluate the project’s effect on public trust resources in the Great Lakes.

Background

Line 5 has carried petroleum products across Michigan since the Michigan Public Service Commission (“PSC”) approved it in 1953.  At the Straits of Mackinac, the line runs through two 20-inch pipes resting on or suspended above the lakebed.  Under a 2017-2018 agreement with the State, Enbridge Energy proposed to decommission those pipes and replace them with a single 30-inch pipe housed in a concrete-lined tunnel bored beneath the lakebed.  The Legislature created the Mackinac Straits Corridor Authority to own the tunnel and lease it to Enbridge for 99 years.  Several Tribal nations, including the Bay Mills Indian Community and the Grand Traverse Band of Ottawa and Chippewa Indians, together with environmental organizations, intervened before the PSC to oppose the project.  On Enbridge’s motion, the administrative law judge excluded evidence concerning the public need for Line 5, its operational safety, and its effect on climate change.  After Governor Whitmer issued a notice revoking the 1953 easement, the PSC remanded, and the administrative law judge again limited the proceedings.  The PSC confined its review under the Michigan Environmental Protection Act (“MEPA”) to the tunnel segment and refused to consider oil-spill risks from the remainder of Line 5.  It nonetheless considered the greenhouse-gas emissions of the products flowing through the entire line.  The PSC approved the project and declined to address the public trust doctrine, and the Court of Appeals affirmed under a deferential standard of review.

Holding

The Court reversed and remanded to the PSC.  First, courts review an agency’s application of MEPA de novo, regardless of whether the matter began in court or in an administrative proceeding.  Nothing in the text of MCL 324.1705(2) suggests a separate deferential standard, and independent review serves MEPA’s purpose of developing a common law of environmental quality through judicial decisions.  Second, after defining the “conduct” at issue, the decision-maker must identify the environmental harms that the conduct factually and proximately causes.  Speculation is insufficient, but the PSC was required to determine as a factual matter whether the tunnel would extend the operating life of Line 5 and bring additional environmental risk with it.  The PSC also acted inconsistently when it counted pipeline-wide emissions while disregarding pipeline-wide spill risk.  Third, the alternatives analysis must compare alternatives in a fair and reasoned manner, and the PSC erred by comparing alternatives that would replace all of Line 5 against the tunnel segment alone.  Fourth, MEPA separately requires consideration of the conduct’s potential effect on public trust resources, meaning the public’s rights to fish, hunt, navigate, and otherwise use the waters of the Great Lakes.

Significance

The decision is among the most significant environmental rulings in Michigan in several decades.  It does not foreclose the tunnel project, but it requires a substantially broader environmental review on remand.  It also establishes the governing framework for future cases under the Michigan Environmental Protection Act: de novo review of agency determinations, a proximate-cause standard for identifying cognizable environmental harms, a comparison of alternatives of equivalent scope, and an independent public trust analysis.

Opinions

Justice Welch wrote for the majority, joined by Chief Justice Cavanagh and Justices Bernstein, Bolden, Thomas, and Hood.  Justice Zahra concurred in part and dissented in part.  He agreed only that the PSC must make express public trust findings.  He would have deferred to the PSC’s expertise and limited the review to the tunnel project itself.

Citation

In re Application of Enbridge Energy to Replace and Relocate Line 5, ___ Mich ___; ___ NW3d ___ (2026) (Docket Nos. 168335-168339, 168346).  Decided July 31, 2026.  Read the full opinion (PDF) from the Michigan Supreme Court.

This summary is provided for general information about developments in Michigan law.  It does not constitute legal advice.  Readers should consult the full opinion because the case may be subject to further proceedings.